3 in 1 Water Filling Machinery Mineral Water Filling Plant Pure Water Production Line

3 in 1 Water Filling Machinery  Mineral Water Filling Plant  Pure Water Production Line

three in 1 Drinking water Filling CZPT/ Mineral H2o Filling Plant/ Pure Drinking water Generation Line

 

 

Bottle Washing Component

CZPT cramps are utilised in the bottle washing approach. The empty bottles can be turned over 180° Together the conveying rail. There are two instances of inner and exterior washing, the effectiveness of bottle washing is higher.

Rinsing equipment adopts overturn and double-opened bottle clip. Bottle clip lock the bottleneck, the materials of bottle clip is SUS304, which is hygienic and resilient.

Bottle clip geared up with productive spray on nozzle. The extrusive droplet with 15° Angle ensures to wash all aspect of the bottle, and can help save the water.

Manufactured of stainless metal of excellent high quality.
Outfitted with bottle jam safety system.

Bottle Filling Portion

The layout of filling framework is sensible and hygiene useless angle, the run of equipment is stable, it can handle the substance from the bottleneck, the management accuracy is inside ± 2mm (topic to bottle style). The filling valve materials is SUS304. The filling technique has liquid amount automatic manage. Filling valve lift is controlled by the valve elevator, soon after filling valve make contact with the bottleneck, it begin to fill. Bottle is conveying by the wheel in the filling part.

Bottle Capping Part


 

Screw capping equipment is most precision portion in the three-one device, it has a big affect to the merchandise stability and faulty charge. 

 

  Applicable items: Pure water, mineral drinking water ,and so forth. (300ml-2000ml)

           Applicable  containers: PET bottles, glass bottles, steel cans, pull ring cans and PP bottles.

           Filling theory : Gravity filling, flowmeter filling, weighing filling 

           Filling temperature : Room temperature

           Production potential : 3000BPH – 36000BPH 

Description:

This product is a kind of 3-in-one device drinking water filling equipment for making potable consuming water like pure water, mineral drinking water and many others.The device incorporates rinsing, filling and capping into one particular and is a sort of total-computerized tools. It is suitable for making PET and plastic bottled mineral h2o and purified h2o. The technique of filling adopts gravity or micro-stress filling which makes the filling velocity more quickly and more stable. As a result, when compared with similar items, this device has characteristics of greater output and greater rewards. The tools is equipped with sophisticated Mitsubishi programmable PLC to control the operation and cooperated by frequency converter of the main motor it tends to make the procedure far more secure and trustworthy. The photoelectric sensor is utilised to detect functioning situations of each section, which tends to make the operation of this equipment hugely automatic and convenient.

CZPT Characteristics:

one. Direct link technologies is adopted amongst air conveyor and bottle-feeding star wheel, and there is no bottle feeding screw and conveying chain. It is very easy to change the bottle shape.

two. Bottleneck-maintain engineering is adopted for bottle conveying. Although altering the bottle shape, consumers only want to substitute the arc information plate, star wheel and other nylon parts that are appropriate to the bottle diameter.

three. The three in one device machine incorporates rinsing, filling, and capping into one, as a result creating bottle use fee reduce, conveying exact and secure, modifying bottle form far more practical.

four. The specially developed bottle gripper of rinser is made of completely stainless steel,so it is sturdy and company. Aside from, it will not get in touch with with the screw elements of bottleneck, hence steering clear of the secondary contamination.

5. The equipment is created with large-speed mass movement isobar filling valve to guarantee the high filling speed and precise liquid level CZPT any reduction. 

six.Elements making contact with with liquid are all manufactured of substantial-quality stainless steel and foods-grade engineering plastic, and most electrical programs adopt imported elements that meet our state meals hygienic standards.

seven. Bottle-outputting star wheel and bottle-base supporting plate adopt spiral winding approach, and there is no require to adjust the top of bottle conveying chain although modifying the bottle condition.

           

Principal Types:

Model

Output

XGF14-12-5

5000BPH (500ml)

XGF16-16-5

7000BPH (500ml)

XGF24-24-6

10000BPH (500ml)

XGF32-32-8

15000BPH (500ml)

XGF40-40-10

18000BPH (500ml)

XGF50-fifty-twelve

22000BPH (500ml)

XGF72-seventy two-eighteen

30000BPH (500ml)

XGF84-eighty four-20

36000BPH (500ml)

Primary merchandise

one. Mineral Water/ Pure Drinking water Filling Production Line
2. Carbonated Drink Filling Generation Line
three. Juice(with pulp)/ Tea Drink Filling Creation Line
4. Water remedy, Bottle Unscrambler,Sterlizer and all sorts of auxiliary products.
Profession in dealing with all sort of beverage line turnkey project!
five. Semi-auotomatic/ Full-automated PET Bottle Blowing Equipment
6. 3-five Gallon Barrel Water Filling Creation Line 

Organization info

 Pre-sales  Q&A 

1.Are you a trading business or a manufacturer?
We are a manufacturer with a lot more than 15 several years expertise supply the manufacturing unit price machine with good high quality, welcome to check out !

two.Do you have reference project?
We have reference undertaking in most nations around the world,If we get the authorization of the customer who has introduced the machines from us ,we can notify you their make contact with imformation,you can go to vist their manufacturing facility.
And you are constantly welcome to arrive to pay a visit to our business,and see the device working in our factory,we can decide you up from the station near our metropolis.
Speak to our revenue individuals you can get video clip of our reference operating device

3.Do you have agent and after-services stations?
So far we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to sign up for us!

4.Do you have any certificate
we have been certificated by the famous cercification authority http:///Certificates.html

5.Do you supply turnkey venture

Turnkey project CZPT We can assist you to begin a new organization in beverage creating.Pls get in touch with with our product sales men and women

six.Do you provide CZPT support
we can design and style the equipment in accordance your demands(materil ,energy,filling variety,the types of the bottles,and so on),at the same time we will give you our specialist recommendation,as you know,we have been in this business for several a long time.

seven.What is actually your promise or the guarantee of the good quality if we purchase your machines?
We provide you large top quality devices with 1 yr assure and supply existence-extended technical assistance.

Sale Q&A
1.What is your payment term?
We take 30% deposit 70%TT prior to cargo by TT/LC/Western union 

two.What is actually your shipping and delivery term?
We give EXW,FOB,CFR,CIF shipping terms

3.How to examination device ahead of shipping and delivery?
Equipment screening operating more than 8 hours, and sending tests videos.

4.How about the Packaging details?
CZPT export packing, major goods employing export plywood situation packing, tiny items use thick carton packing, make sure that the item packaging integrity and safety

Soon after sales Q&A
one.When can I get my equipment right after I paid?
Generally production time is about 30-60days,the exactly rely on what kind of equipment you buy.The delivery time is based mostly on your location port.

2.How to set up my machines when it arrives?how a lot the value?
We will ship our engineers to your factory to set up the devices and practice your staff how to function the devices. CZPTer shell out spherical airtickets,engineer visa expense,lodging and engineer salary USD100/day/particular person.

3.When can i get engineers from you?
When you end the Preparing conditions(water resource,electricity,air supply,creation materials)get in touch with with our product sales men and women we will dispatch engineer to put in the device for you ,and practice your staff to use the equipment effectively.Usually when you preparation is carried out,you speak to with our income individuals and cooperate us to get the visa for the engineer and our engineer will be below inside of fifteen times.

four.How lengthy time for set up?
In accordance your equipment buy,we will send one or two engineers to your plant,it will get about 10 days to twenty five days.

5.How about the spare elements?
We will send out 1 year enough straightforward broken spare components with each other with the machines,delivery with each other.In the course of the warranty time,we will offer the spare parts with our value such as the shipping and delivery expenses.

for additional much more wants and inquiry pls get in touch with with Miss
 

Contact us

 

3 in 1 Water Filling Machinery  Mineral Water Filling Plant  Pure Water Production Line

Tags

drag chains

As one of leading drag chains manufacturers, suppliers and exporters of mechanical products, We offer drag chains and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of drag chains

Recent Posts